![]() We include field photographs, material data sheets, clearly tagged drawings and well-defined specifications to guarantee project success. The repair message must be carefully considered to ensure unconventional repairs are communicated clearly. Only when the cause of deterioration has been resolved do we proceed to develop restoration solutions.ĭeveloping the drawings and specifications for a repair project is quite different than a new building project. We focus in on areas of concern to ensure our field investigations are concentrated on probable areas of concern. Maximum cantilever of a floor joist is 24 5. Floor joist MUST be minimum 2x8 TBL 2.1.3 SB-7 4. Floor joist must have a minimum of one row of blocking as per Table A-1 and the chart below. (Quick reference chart at the bottom of this document) 2. Each project typically commences with a thorough and detailed existing document review, which can include original building drawings and reports. Floor joists must meet requirements of Table A-1 of the 2012 Ontario Building Code. We work closely with manufacturers of specialized repair materials and equipment to ensure the repairs we specify are high performance, durable and warrantied. Our repair details and specifications deliver the results our clients expect, especially when structural integrity has been compromised. ![]() We creatively develop repair programs that are suitable for each unique project.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |